2 MW Solar operating in Frederick, MD — PJM Interconnection, LLC
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
39.3699, -77.3538
County
Frederick, MD
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tesla Inc. | Tesla | — |
| Owner(s) | Solar Integrated Fund VI, LLC | Solar Integrated Fund VI LLC [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Solar Integrated Fund VI LLC [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
The Frederick County - Landfill solar photovoltaic plant is located in Frederick County, Maryland. The plant, owned and operated by Tesla Inc., has a total capacity of 2 MW from a single generator. It commenced operations in 2019, utilizing solar energy as its primary fuel source. The plant's solar panels are mounted with a fixed tilt.
In its most recent year of operation, the Frederick County - Landfill plant generated 2,257 MWh of electricity, achieving a capacity factor of 12.9%. The plant operates within the PJM Interconnection, LLC balancing authority, which is part of the RFC NERC region. In terms of size, the facility ranks 97th out of 183 power plants in Maryland, and 5081st out of 7108 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
12.9 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
120 MWh
Latest Month
2.3K MWh
Annual Generation
12.9%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
WESTERN HUB
Node Source
OSM spatial match