2.8 MW Batteries (1 MW) + Solar Photovoltaic (2 MW) operating in Contra Costa, CA — California Independent System Operator
2.8 MW
Nameplate Capacity
3
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2025
Operating Since
Coordinates
37.7663, -121.9617
County
Contra Costa, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Camino Ramon BR 2600 Solar Project 2020, LLC | — | — |
| Owner(s) | Camino Ramon BR 2600 Solar Project 2020, LLC | — | — |
| Status | Operating | operating | — |
Bishop Ranch - BR 2600 is a hybrid solar and battery energy storage system located in Contra Costa County, California. The plant has a total capacity of 2.8 MW and is owned and operated by Camino Ramon BR 2600 Solar Project 2020, LLC. The facility commenced operations in 2025 and utilizes solar photovoltaic technology as its primary energy source, supplemented by battery storage. The solar panels are mounted with a fixed tilt. The battery energy storage system (BESS) has a duration of 1.91 hours.
The plant consists of 3 generators and operates within the California Independent System Operator (CAISO) balancing authority, falling under the Western Electricity Coordinating Council (WECC) NERC region. Bishop Ranch - BR 2600 is ranked as the 439th largest plant in California out of 862 facilities and holds a national ranking of 4148 out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
SANRAMON_2_N024
Pricing Hub
TH_NP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match