2.8 MW Solar operating in Howard, AR — Southwest Power Pool
2.8 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Entegrity Solar UA AG, LLC | — | — |
| Owner(s) | Entegrity Solar UA AG, LLC | — | — |
| Status | Operating | operating | — |
Located in Howard County, Arkansas, the UADA solar photovoltaic plant has a total capacity of 2.8 MW. The plant began operating in 2023 and is owned and operated by Entegrity Solar UA AG, LLC. It utilizes a single-axis tracking system to maximize solar energy capture. The plant is interconnected with the Southwest Power Pool (SPP) balancing authority and falls within the Midwest Reliability Organization (MRO) NERC region.
In its latest year of operation, the UADA plant generated 5,889 MWh of electricity, achieving a capacity factor of 23.9%. The plant is ranked as the 46th largest out of 77 operational plants in the state of Arkansas. Nationally, it holds a rank of 4155 out of 7108 plants. The facility consists of one generator utilizing solar energy as its primary fuel source.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Southwest Power Pool
Grid Voltage
12.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
234 MWh
Latest Month
5.9K MWh
Annual Generation
23.9%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
South Nashville Substation · 138 kV
Substation Distance
< 10 km
Operator
Southwestern Electric Power Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
SPP South Hub
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.