4.6 MW Solar operating in Penobscot, ME — ISO New England Inc.
4.6 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
45.2581, -68.6665
County
Penobscot, ME
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | NextGrid Corkwood, LLC | — | — |
| Owner(s) | NextGrid Corkwood, LLC | — | — |
| Status | Operating | operating | — |
Corkwood Solar (CSG) is a 4.6 MW solar photovoltaic power plant located in Penobscot County, Maine. The plant began operating in 2023 and is owned and operated by NextGrid Corkwood, LLC. It consists of a single generator utilizing fixed tilt solar tracking technology. Corkwood Solar is interconnected to the ISO New England Inc. balancing authority and operates within the NPCC NERC region.
In its most recent year of operation, Corkwood Solar generated 5,423 MWh of electricity, achieving a capacity factor of 13.4%. The plant ranks 84th in size among Maine's 153 power plants and 3230th nationally out of 7108 plants. The primary fuel source for Corkwood Solar is the sun.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
176 MWh
Latest Month
5.4K MWh
Annual Generation
13.4%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
—
Pricing Hub
.Z.MAINE
Node Source
OSM spatial match