13 MW Hydro operating in Penobscot, ME — ISO New England Inc.
13 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1988
Operating Since
Coordinates
45.2499, -68.6483
County
Penobscot, ME
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Brookfield Black Bear Hydro, LLC | — | — |
| Owner(s) | Black Bear Power LLC | — | — |
| Status | Operating | — | — |
West Enfield Hydro is a 13 MW hydroelectric power plant located in Penobscot County, Maine. The plant began operating in 1988 and is owned and operated by Brookfield Black Bear Hydro, LLC. It utilizes conventional hydroelectric technology with water (WAT) as its primary fuel source. The facility consists of two generators.
In the most recent year of record, West Enfield Hydro generated 77,485 MWh of electricity, achieving a capacity factor of 66.6%. The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. West Enfield Hydro is ranked as the 17th largest power plant out of 51 in the state of Maine, and 588th out of 1464 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
46 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
5.8K MWh
Latest Month
77.5K MWh
Annual Generation
66.6%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
UN.ENFLD_ME115 IND5
Pricing Hub
.Z.MAINE
Node Source
Curated node match
Arknights: Endfield - All Hub Chest Locations
Here is the location of every chest in The Hub starting area of Arknights: Endfield.
Negotiations on securing future of Crossrail 2 continue as funding sought
Negotiations are ongoing to secure the future of a multibillion pound railway running north-south through London, the government has confirmed.
Brookfield: the dam king of Maine
About a quarter of the electricity generated in Maine comes from hydropower, and most of that is produced by Brookfield Renewable.
Owner of West Enfield dam accuses Versant of stealing $2M
Versant Power wrongfully claimed more than $2 million of renewable energy credits from a hydroelectric dam, a lawsuit alleges.
Last updated 2026-03-26