80 MW Solar operating in Adams, PA — PJM Interconnection, LLC
80 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
39.8796, -77.1972
County
Adams, PA
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Adams Solar LLC (PA) | Energix Renewables | — |
| Owner(s) | Adams Solar LLC (PA) | Energix Renewables | — |
| Status | Operating | operating | — |
GEM identifies the owner as Energix Renewables
This entity is not yet in the GEM ownership database — chain unavailable.
Adams Solar LLC PA is an 80 MW solar photovoltaic power plant located in Adams County, Pennsylvania. The plant, owned and operated by Adams Solar LLC (PA), began commercial operation in 2023. It utilizes single-axis tracking technology. As of its latest annual reporting, the plant generated 141,177 MWh, achieving a capacity factor of 20.1%.
The plant operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. Adams Solar LLC PA ranks as the 12th largest solar plant in Pennsylvania out of 87, and 713th nationally out of 7108. Financial data indicates a power purchase agreement (PPA) price of $39.84 per MWh, based on data from Lawrence Berkeley National Laboratory (LBNL).
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
4.5K MWh
Latest Month
141.2K MWh
Annual Generation
20.1%
Capacity Factor
$58.7/MWh
LCOE (Levelized Cost)
$39.8/MWh
PPA Price
$29.9/MWh
Energy Value
Point of Interconnection
Nearest Substation
Hunterstown Generation · 500 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
WESTERN HUB
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
Last updated 2026-03-26