60 MW Natural Gas operating in Adams, PA — PJM Interconnection, LLC
60 MW
Nameplate Capacity
3
Generators
units
Natural Gas Fired Combustion Turbine
Technology
1971
Operating Since
Coordinates
39.8661, -77.1649
County
Adams, PA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Hunterstown Power, LLC | — | — |
| Owner(s) | Hunterstown Power, LLC | — | — |
| Status | Operating | — | — |
Hunterstown is a 60 MW natural gas-fired power plant located in Adams County, Pennsylvania. The plant began operating in 1971 and consists of three natural gas-fired combustion turbine generators. Hunterstown Power, LLC owns and operates the facility. The plant is connected to the PJM Interconnection, LLC balancing authority, within the ReliabilityFirst Corporation (RFC) NERC region.
In the most recent year of reported data, Hunterstown generated 12,383 MWh of electricity, achieving a capacity factor of 2.3%. Hunterstown ranks as the 41st largest power plant in Pennsylvania out of 68 facilities, and 1065th nationally out of 1963 plants. Recent news coverage of Hunterstown has focused on deals, grid operations, and regulatory matters.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
1.1K MWh
Latest Month
12.4K MWh
Annual Generation
2.3%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Hunterstown Substation · 115 kV
Substation Distance
< 10 km
Operator
Met-Ed
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
50739
Pricing Hub
WESTERN HUB
Node Source
EIA-860 direct report
PA Oil & Gas Industrial Facilities: Permit Notices, Opportunities To Comment - October 4
The following notices were published in the October 4 PA Bulletin related to oil and gas industry facilities. Many of the notices offer the...
PJM’s fast-track interconnection initiative nets 26.6 GW in proposals
Proposals from LS Power include converting two peaking facilities to base-load combined cycle plants, along with uprates at existing...
PJM’s fast-track interconnection initiative nets 26.6 GW in proposals
Proposals from LS Power include converting two peaking facilities to base-load combined cycle plants, along with uprates at existing...
PJM’s fast-track interconnection initiative nets 26.6 GW in proposals
Proposals from LS Power include converting two peaking facilities to base-load combined cycle plants, along with uprates at existing...
Last updated 2026-03-26
View all 10 articles