306 MW BESS planned in Hill, TX — Electric Reliability Council of Texas, Inc.
306 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
Planned: —
Planned Operation
Coordinates
31.9002, -97.0164
County
Hill, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | ACTX BESS Project LLC | — | — |
| Owner(s) | ACTX BESS Project LLC | — | — |
| Status | Planned | — | — |
Ash Creek BESS is a 306 MW battery energy storage system located in Hill County, Texas. The plant, identified by the EIA plant code 66391, is owned and operated by ACTX BESS Project LLC. It utilizes MWH as its primary fuel source and consists of a single generator using battery technology.
The facility operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. Ash Creek BESS is ranked as the 47th largest power plant in Texas out of 224, and nationally it holds the 135th position out of 514 plants.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Sam Switching Station · 345 kV
Substation Distance
0.284 km
Operator
NextEra Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
ASCK_SLR_RN
Pricing Hub
HB_NORTH
Secondary Zone
LZ_NORTH
Location Type
Resource Node
Node Source
Curated node match
U.S. installs 14.5 GW of large-scale solar in the first half of 2025
Solar represented 75% of grid capacity additions in the first half, followed distantly by wind and natural gas, said new data from the...
Primergy starts commercial operations at 408MWac Ash Creek Solar project in Texas
The project is providing energy to tech giant Microsoft through a US$588 million power purchase agreement (PPA) signed in March 2024. Image: Primergy.
Microsoft activates 408 MW Ash Creek solar project in Texas
Primergy Solar has brought the 408 MWac Ash Creek solar facility in Texas online, adding new capacity to the Electric Reliability Council of...
Primergy starts commercial operations at 408MWac Ash Creek Solar project in Texas
The project is providing energy to tech giant Microsoft through a US$588 million power purchase agreement (PPA) signed in March 2024. Image: Primergy.
Last updated 2026-03-14