304 MW Batteries (50 MW) + Solar Photovoltaic (254 MW) operating in Lake, TN — Tennessee Valley Authority
304 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2025
Operating Since
Coordinates
36.3063, -89.4620
County
Lake, TN
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Leeward Asset Management, LLC | Leeward Renewable Energy | — |
| Owner(s) | Leeward Asset Management, LLC | First Solar Inc [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as First Solar Inc [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Ridgely Energy Farm is a hybrid power plant located in Lake County, Tennessee. The facility, owned and operated by Leeward Asset Management, LLC, has a total capacity of 304 MW. It began operating in 2025 and utilizes both solar photovoltaic and battery storage technologies. The primary fuel type is listed as MWH, reflecting the hybrid nature of the plant.
The plant consists of two generators and features a battery energy storage system (BESS) with a duration of 1.6 hours. The solar array employs a fixed tilt tracking system. Ridgely Energy Farm operates within the Tennessee Valley Authority balancing authority and the SERC NERC region. It is ranked as the largest of its kind in Tennessee and 138th nationally out of 514 similar facilities.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Tennessee Valley Authority
Grid Voltage
kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
14.4K MWh
Latest Month
—
Annual Generation
—
Capacity Factor
No financial data available for this plant.
This plant is outside organized wholesale electricity markets (ISOs/RTOs). Nodal pricing data is not available.
Wisconsin to host 1 GW data center | Projects Weekly
In today's edition of Projects Weekly, we're starting off with a massive data center project, as OpenAI, Oracle and Vantage Data Centers...
Leeward starts operations at 177MW Tennessee solar project
Leeward Renewable Energy has started commercial operations at its 177MW Ridgely solar project in the US state of Tennessee.
LRE Brings First Tennessee Solar Project Online
LRE (Leeward Renewable Energy) today announced the completion of construction and start of commercial operations at its 177-megawatt (MW)...
Last updated 2026-03-14