4.4 MW Solar operating in Wayne, IN — PJM Interconnection, LLC
4.4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
39.8118, -84.9605
County
Wayne, IN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Indiana Municipal Power Agency | Indiana Municipal Power Agency | — |
| Owner(s) | Indiana Municipal Power Agency | Indiana Municipal Power Agency | — |
| Status | Operating | operating | — |
IMPA Richmond Solar Park 7 is a 4.4 MW solar photovoltaic power plant located in Wayne County, Indiana. The plant began operating in 2023 and is owned and operated by the Indiana Municipal Power Agency (IMPA). It consists of a single generator utilizing single-axis tracking technology to maximize solar energy capture. The plant is interconnected to the grid and operates within the PJM Interconnection, LLC balancing authority, which falls under the RFC NERC region.
In its most recent year of operation, IMPA Richmond Solar Park 7 generated 7,620 MWh of electricity, achieving a capacity factor of 19.7%. Based on total capacity, the plant ranks as the 76th largest solar facility in Indiana out of 136, and 3315th nationally out of 7108. The plant's primary fuel source is solar energy (SUN).
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
13.8 kV
Regulatory Status
RE
Entity Type
Political Subdivision
Sector
Electric Utility
274 MWh
Latest Month
7.6K MWh
Annual Generation
19.7%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
PJM
LMP Node
RICHMOND69 KV T1
Pricing Hub
N ILLINOIS HUB
Location Type
Load Node
Node Source
Curated node match