4.4 MW Solar testing in Fresno, CA — California Independent System Operator
4.4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
—
Operating Since
Coordinates
36.6281, -120.5708
County
Fresno, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | CES Electron Farm One, LLC | — | — |
| Owner(s) | CES Electron Farm One, LLC | — | — |
| Status | Testing | construction | — |
Conflitti Solar is a 4.4 MW solar photovoltaic power plant located in Fresno County, California. The plant is owned and operated by CES Electron Farm One, LLC. It utilizes a single generator and employs fixed-tilt solar tracking technology. The primary fuel source for electricity generation is solar energy.
Conflitti Solar operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant is ranked as the 323rd largest solar facility in California out of 862, and nationally it holds a rank of 3306 out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
21 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
PANOBS1_7_B1
Pricing Hub
TH_NP15_GEN-APND
Secondary Zone
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match