1.4 MW Solar operating in Henry, IN — Midcontinent Independent Transmission System Operator, Inc..
1.4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
40.0917, -87.0692
County
Henry, IN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Indiana Municipal Power Agency | Indiana Municipal Power Agency | — |
| Owner(s) | Indiana Municipal Power Agency | Indiana Municipal Power Agency | — |
| Status | Operating | operating | — |
The IMPA Middletown Solar Park is a 1.4 MW solar photovoltaic power plant located in Henry County, Indiana. The plant began operating in 2023 and is owned and operated by the Indiana Municipal Power Agency (IMPA). It consists of a single generator utilizing single-axis tracking to maximize solar energy capture.
The plant's latest annual generation was 2,520 MWh, resulting in a capacity factor of 20.5%. The IMPA Middletown Solar Park operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority, and is within the RFC NERC region. In terms of size, the plant is ranked 115th out of 136 power plants in Indiana, and 5972nd out of 7108 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
12.47 kV
Regulatory Status
RE
Entity Type
Political Subdivision
Sector
Electric Utility
91 MWh
Latest Month
2.5K MWh
Annual Generation
20.5%
Capacity Factor
No financial data available for this plant.