4.8 MW Solar operating in Montgomery, IN — Midcontinent Independent Transmission System Operator, Inc..
4.8 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
40.0778, -86.8960
County
Montgomery, IN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Indiana Municipal Power Agency | Indiana Municipal Power Agency | — |
| Owner(s) | Crawfordsville 3 Solar Array, LLC | Crawfordsville 3 Solar Array LLC [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Crawfordsville 3 Solar Array LLC [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Crawfordsville 3 Solar Park is a 4.8 MW solar photovoltaic power plant located in Montgomery County, Indiana. The plant began operating in 2019 and is owned and operated by the Indiana Municipal Power Agency. It utilizes single-axis tracking technology to maximize solar energy capture. As of the latest rankings, Crawfordsville 3 Solar Park is the 75th largest solar plant in Indiana out of 136, and the 3185th largest in the United States out of 7108.
The plant's primary fuel source is solar energy. In its most recent year of operation, Crawfordsville 3 Solar Park generated 8,483 MWh of electricity, achieving a capacity factor of 20.1%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority, and is located within the ReliabilityFirst Corporation (RFC) NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
13.8 kV
Regulatory Status
RE
Entity Type
Political Subdivision
Sector
Electric Utility
245 MWh
Latest Month
8.5K MWh
Annual Generation
20.1%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
INDIANA.HUB
Node Source
OSM spatial match