300 MW Solar planned in Uvalde, TX — Electric Reliability Council of Texas, Inc.
300 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
29.2258, -99.6991
County
Uvalde, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Consolidated Edison Development Inc. | Consolidated Edison Development Inc. | — |
| Owner(s) | Consolidated Edison Development Inc. | Consolidated Edison Development Inc. | — |
| Status | Planned | announced | — |
GEM identifies the owner as Consolidated Edison Development Inc.
This entity is not yet in the GEM ownership database — chain unavailable.
Uvalde Solar 2 is a 300 MW solar photovoltaic power plant located in Uvalde County, Texas. The plant, which utilizes fixed-tilt solar tracking technology, has one generator. It is owned and operated by Consolidated Edison Development Inc. The plant's primary fuel source is solar energy.
Uvalde Solar 2 operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. It ranks as the 45th largest solar plant in Texas out of 192, and 75th nationally out of 639.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Helios Substation · 138 kV
Substation Distance
1.934 km
Operator
Consolidated Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
HELIOS_RN
Pricing Hub
HB_SOUTH
Secondary Zone
LZ_SOUTH
Location Type
Resource Node
Node Source
Curated node match
Solv Energy selected to deliver EPC services for a 209 MWdc solar power project in Uvalde, Texas
It seems like the United States is in a fierce competition against itself when it comes to generating solar energy.
Solv Energy to build 209MW Texas solar project for Sol Systems
IPP Sol Systems has selected Solv Energy as the EPC services provider for a 209MW solar PV plant in Texas, US.
OCI Energy, Arava Power form joint venture to develop 260-MW solar project
OCI Energy and Arava Power have entered into their second agreement — forming a joint venture to develop Project SunRoper, a 260-MWAC solar farm...
What You Need to Know About the 89th Texas Legislative Session
The Texas Legislative session lasts 140 days, beginning in mid-January and ending in early June. But here at the Lone Star Chapter, we know that the 89th...
Last updated 2026-03-14
View all 8 articles