100 MW Solar operating in Uvalde, TX — Electric Reliability Council of Texas, Inc.
100 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2015
Operating Since
Coordinates
29.2180, -99.7066
County
Uvalde, TX
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Consolidated Edison Development Inc. | OCI Solar Power | — |
| Owner(s) | Consolidated Edison Development Inc. | OCI Solar Power [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as OCI Solar Power [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
OCI Alamo 5 LLC is a 100 MW solar photovoltaic power plant located in Uvalde County, Texas. The plant began operating in 2015 and has one generator. It is owned and operated by Consolidated Edison Development Inc. The facility utilizes dual-axis solar tracking technology.
The plant's latest annual generation was 186,384 MWh, resulting in a capacity factor of 21.2%. OCI Alamo 5 LLC is ranked 187th out of 192 power plants in Texas, and 633rd out of 639 nationally. The plant operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority. Financial data is available for the plant from LBNL, though specific figures are not provided.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
9.5K MWh
Latest Month
186.4K MWh
Annual Generation
21.2%
Capacity Factor
$88.2/MWh
LCOE (Levelized Cost)
$22.1/MWh
Energy Value
Point of Interconnection
Nearest Substation
Uvalde Substation · 69 kV
Substation Distance
0 km
Operator
South Texas Electric Cooperative
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
HELIOS_RN
Pricing Hub
HB_SOUTH
Secondary Zone
LZ_SOUTH
Location Type
Resource Node
Node Source
Curated node match
PUC Recommends $7.5M in Fines for Power Plants That Failed to File Winterization Reports
The Public Utility Commission of Texas is recommending $7.5 million in fines against eight power generation companies who failed to file...
Uvalde County Commissioners to Act on Tax Abatement for $168M Solar Farm
Feature Photo: The Alamo 5 solar power farm east of Garner Field Airport in Uvalde County: Courtesy: OCI Solar Power. Posted: 9-23-2020.
Alamo Solar Power Project, San Antonio, Texas, US
The 400MW solar photovoltaic (PV) Alamo power plant is being developed by a public-private partnership of OCI Solar Power and CPS Energy.
OCI sells solar farm for $385 million
San Antonio-based OCI Solar Power is selling its final solar project under the 400-megawatt deal with CPS Energy for $385 million to an undisclosed buyer.