196.3 MW Solar operating in Calhoun, TX — Electric Reliability Council of Texas, Inc.
196.3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
28.6885, -96.5098
County
Calhoun, TX
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tres Bahias Solar Power, LLC | Swift Current Energy | — |
| Owner(s) | Tres Bahias Solar Power, LLC | Swift Current Energy [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as Swift Current Energy [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Tres Bahias is a 196.3 MW solar photovoltaic power plant located in Calhoun County, Texas. The plant, which began operating in 2024, is owned and operated by Tres Bahias Solar Power, LLC. It consists of a single generator utilizing single-axis tracking technology to maximize solar energy capture. Tres Bahias is connected to the Electric Reliability Council of Texas (ERCOT) grid, falling within the TRE NERC region.
In its most recent year of operation, Tres Bahias generated 438,740 MWh of electricity, achieving a capacity factor of 25.5%. The plant ranks 120th in size among Texas power plants (out of 192) and 271st nationally (out of 639). Financial data is available for the plant, sourced from Lawrence Berkeley National Laboratory (LBNL) solar energy studies.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Tres Bahias Solar
22.6K MWh
Latest Month
438.7K MWh
Annual Generation
25.5%
Capacity Factor
$37.6/MWh
LCOE (Levelized Cost)
Market Position
ISO/RTO Market
ERCOT
LMP Node
TREB_SOLAR1
Pricing Hub
HB_SOUTH
Secondary Zone
LZ_SOUTH
Location Type
Resource Node
Node Source
EIA-860 direct report
Texas solar boom project updates
Hundreds of megawatts of clean energy head to Texas as Microsoft signs a power purchase agreement, Amshore secures land for solar and batteries.
UnitedHealth Group launches new renewable energy investments to support emissions reduction targets
UnitedHealth Group's first-ever virtual power purchase agreement (VPPA) and solar energy project will match almost 90% of the company's US...
Ideematec to supply trackers for Parliament Solar project in Texas
Tres Bahias solar project from Swift Current Energy in Southeast Texas with a 266MW capacity. Image: Swift Current Energy.
Swift Current Energy takes step to open Texas solar farm in SE Texas
Sift Current Energy closes project financing on 195 megawatt solar farm in Calhoun County.
Last updated 2026-03-14
View all 6 articles