199 MW Solar planned in Fulton, OH — PJM Interconnection, LLC
199 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
41.6949, -84.3168
County
Fulton, OH
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Repsol Renewables NA | — | — |
| Owner(s) | Repsol Renewables NA | — | — |
| Status | Planned | announced | — |
Ritter Solar is a 199 MW solar photovoltaic power plant located in Fulton County, Ohio. The plant is operated by Repsol Renewables NA and utilizes fixed-tilt solar tracking technology. It is the tenth-largest solar plant in Ohio out of 31, and ranks 268th nationally among 639 solar facilities. The plant's primary fuel source is solar energy (SUN).
The facility is located within the PJM Interconnection, LLC balancing authority and the RFC NERC region. Ritter Solar consists of a single generator. News coverage of the plant has focused on regulatory matters and industry developments.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Fayette Substation · 138 kV
Substation Distance
2.49 km
Operator
Toldeo Edison
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
02FAYET 138 KV BUCKWOLV
Pricing Hub
AEP-DAYTON HUB
Location Type
Load Node
Node Source
Curated node match
OPSB approves natural gas plant to power data center in Licking County
The Ohio Power Siting Board approved an agreement allowing PowerConneX New Albany 2 to build a 216-megawatt behind-the-meter power plant in...
Repsol Addresses State Ruling On Ritter Station Solar
By: Jacob Kessler THE VILLAGE REPORTER jacob@thevillagereporter.com. Repsol has issued a statement following the Ohio Power Siting Board's...
Ohio approves 199-MW solar project in Fulton County
The Ritter Station Solar Project, which would overtake around 1700 acres of land in Gorham Township, was approved by the state Thursday.
Ohio Power Siting Board Approves Ritter Station Solar Project Near Fayette In 7–2 Vote