400 MW Batteries (200 MW) + Solar Photovoltaic (200 MW) planned in Matagorda, TX — Electric Reliability Council of Texas, Inc.
400 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
28.8660, -96.1217
County
Matagorda, TX
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Eldora Energy LLC | Eldora Energy | — |
| Owner(s) | Eldora Energy LLC | Advanced Power | — |
| Status | Planned | announced | — |
Eldora Energy LLC is a 400 MW hybrid power plant located in Matagorda County, Texas. The plant, owned and operated by Eldora Energy LLC, a subsidiary of the Swiss company Advanced Power, utilizes both battery storage and solar photovoltaic technologies. It consists of two generators and is fueled by MWH (presumably electricity from the grid, given the battery component). The solar array uses a fixed tilt tracking system.
Eldora Energy LLC operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority and the TRE NERC region. It is ranked as the 29th largest power plant in Texas out of 224, and 99th nationally out of 514. The plant's hybrid nature and location in the ERCOT market have garnered some industry attention, as evidenced by two news articles, one focusing on deals and the other on general industry news.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
South Texas Project Tap · 138 kV
Substation Distance
< 10 km
Operator
American Electric Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_HOUSTON
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Nederland’s purchase of Eldora ski resort remains unfinished
Ink on Nederland's contract to buy the Eldora Mountain ski resort from Powdr Corp. was expected to be dry by now, but as 2026 approaches,...
Advanced Power Closes Sale of Rock Rose Energy Storage
Project demonstrates the company's depth of development expertise. BOSTON, Oct. 9, 2025 /PRNewswire/ -- Advanced Power continues to cement...
Solar exceeds 10% of U.S. electricity generation capacity
Solar dominates project queues through 2028, said data from the Federal Energy Regulatory Commission (FERC).
Solar exceeds 10% of U.S. electricity generation capacity
Solar dominates project queues through 2028, said data from the Federal Energy Regulatory Commission (FERC).
Last updated 2026-03-26
View all 10 articles