9.9 MW BESS operating in Matagorda, TX — Electric Reliability Council of Texas, Inc.
9.9 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2024
Operating Since
Coordinates
28.9941, -96.1262
County
Matagorda, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | HEN Infrastructure, L.L.C. | — | — |
| Owner(s) | HEN Infrastructure, L.L.C., John Hancock Funding Company, Manulife Infrastructure II Holdings A, L.P. | — | — |
| Status | Operating | — | — |
Pavlov is a 9.9 MW battery energy storage system (BESS) located in Matagorda County, Texas. The plant began operating in 2024 and is owned and operated by HEN Infrastructure, L.L.C. The primary fuel source is electricity (MWH), which is used to charge the lithium-ion batteries (LIB). The BESS has a storage capacity of 9.9 MWh and a duration of 1 hour.
The Pavlov plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, and the NERC region is TRE. In terms of size, the plant ranks 304th out of 313 power plants in Texas, and 843rd out of 1205 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
−25 MWh
Net Charging
-109 MWh
Annual Net Energy
-0.1%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
Market Position
ISO/RTO Market
ERCOT
LMP Node
PAVLOV_BESS
Pricing Hub
HB_HOUSTON
Node Source
EIA-860 direct report