2 MW Solar operating in Williamson, IL — Midcontinent Independent Transmission System Operator, Inc..
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
37.7272, -88.8490
County
Williamson, IL
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SV CSG Barrass Farms II LLC | SV CSG Barrass Farms II | — |
| Owner(s) | SV CSG Barrass Farms II LLC | — | — |
| Status | Operating | operating | — |
SV CSG Barrass Farms II LL is a 2 MW solar photovoltaic power plant located in Williamson County, Illinois. The plant began operating in 2023 and has one generator. It is owned and operated by SV CSG Barrass Farms II LLC. The facility utilizes single-axis tracking to maximize solar energy capture.
In its most recent year of operation, SV CSG Barrass Farms II LL generated 4,328 MWh of electricity, achieving a capacity factor of 24.6%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) market and balancing authority. It is located within the SERC Reliability Corporation (SERC) NERC region. The plant ranks 100th in size among 320 power plants in Illinois, and 4690th nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
480 kV
Regulatory Status
NR
Entity Type
Investor-Owned Utility
Sector
IPP Non-CHP
189 MWh
Latest Month
4.3K MWh
Annual Generation
24.6%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ILLINOIS.HUB
Node Source
OSM spatial match