2 MW Solar operating in Williamson, IL — Midcontinent Independent Transmission System Operator, Inc..
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
37.8270, -89.0129
County
Williamson, IL
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Clendenin A Community Solar, LLC | Clendenin A Community Solar | — |
| Owner(s) | Clendenin A Community Solar, LLC | — | — |
| Status | Operating | operating | — |
Clendenin A Community Solar, LLC CSG is a 2 MW solar photovoltaic power plant located in Williamson County, Illinois. The plant began operating in 2021 and is owned and operated by Clendenin A Community Solar, LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology. The plant is interconnected to the Midcontinent Independent Transmission System Operator (MISO) grid, within the Southeastern Electric Reliability Council (SERC) region.
In its most recent year of operation, the plant generated 3,267 MWh of electricity, achieving a capacity factor of 18.6%. Clendenin A Community Solar, LLC CSG ranks as the 174th largest solar plant in Illinois out of 320, and 5096th nationally out of 7108. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
151 MWh
Latest Month
3.3K MWh
Annual Generation
18.6%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ILLINOIS.HUB
Node Source
OSM spatial match