1 MW Solar operating in Chippewa, MN — Midcontinent Independent Transmission System Operator, Inc..
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
44.9528, -95.6990
County
Chippewa, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | DG Central 1, LLC | DG Central 1 | — |
| Owner(s) | DG Central 1, LLC | — | — |
| Status | Operating | operating | — |
Hormel CSG Solar is a 1 MW solar photovoltaic power plant located in Chippewa County, Minnesota. The plant began operating in 2022 and is owned and operated by DG Central 1, LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology. The plant's primary fuel source is solar energy.
In its most recent year of operation, Hormel CSG Solar generated 1,745 MWh of electricity, achieving a capacity factor of 19.9%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority, within the NERC MRO region. Hormel CSG Solar ranks as the 283rd largest power plant in Minnesota out of 540, and 6511th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
13.8 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
49 MWh
Latest Month
1.7K MWh
Annual Generation
19.9%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Fiesta City Substation · 69 kV
Substation Distance
< 10 km
Operator
Xcel Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.