1 MW Solar operating in Washtenaw, MI — Midcontinent Independent Transmission System Operator, Inc..
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2015
Operating Since
Coordinates
42.3243, -83.6947
County
Washtenaw, MI
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | DTE Electric Company | DTE Electric | — |
| Owner(s) | DTE Electric Company | DTE Energy | — |
| Status | Operating | operating | — |
Domino Farms Solar is a 1 MW solar photovoltaic power plant located in Washtenaw County, Michigan. The plant began operating in 2015 and is owned and operated by DTE Electric Company, a subsidiary of DTE Energy. The facility consists of a single generator utilizing fixed-tilt solar tracking technology. Domino Farms Solar is interconnected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and resides within the ReliabilityFirst Corporation (RFC) NERC region.
In its most recent year of operation, Domino Farms Solar generated 1,056 MWh of electricity, achieving a capacity factor of 12.0%. According to available data, the installed cost of the plant was $5,869.75 per kW. Domino Farms Solar ranks as the 83rd largest solar plant in Michigan out of 84 facilities and 6527th nationally out of 7108. Financial data for the plant is sourced from FERC filings.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
750 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
42 MWh
Latest Month
1.1K MWh
Annual Generation
12.0%
Capacity Factor
$5,690/kW
Installed Cost
DTE Electric Company
Reporting Utility
Cumulative Installed Cost
Per-Unit Cost Trends
Point of Interconnection
Nearest Substation
Grenada Substation · 40 kV
Substation Distance
< 10 km
Operator
DTE Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MICHIGAN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.