313 MW Batteries (131 MW) + Solar Photovoltaic (182 MW) operating in San Bernardino, CA — California Independent System Operator
313 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2023
Operating Since
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Daggett Solar Power 2 LLC | Clearway Energy Group | — |
| Owner(s) | Daggett Solar Power 2 LLC | Clearway Energy | — |
| Status | Operating | operating | — |
Daggett 2 is a hybrid solar and battery energy storage system (BESS) power plant located in San Bernardino County, California. The plant, owned by Clearway Energy and operated by Daggett Solar Power 2 LLC, has a total capacity of 313 MW and came online in 2023. It utilizes both solar photovoltaic technology and batteries, with a BESS storage capacity of 4.6 MWh and a duration of 0.04 hours, using lithium-ion battery chemistry (LIB). The solar component employs single-axis tracking. Daggett 2 ranks as the 30th largest power plant in California out of 112, and 132nd nationally out of 514.
The plant's primary fuel source is listed as MWH. In its latest year of operation, Daggett 2 generated 518,910 MWh of electricity, achieving a capacity factor of 18.9%. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Financial data indicates a power purchase agreement (PPA) price of $28.5 per MWh.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
230 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
26.6K MWh
Latest Month
518.9K MWh
Annual Generation
18.9%
Capacity Factor
$28.5/MWh
PPA Price
Daggett Solar Power 2 LLC
Contract Seller
Per-Unit Cost Trends
Market Position
ISO/RTO Market
CAISO
LMP Node
ALTA42GT_7_B1
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
Clearway Energy, Inc. Reports Full Year 2025 Financial Results
Achieved 2025 financial results at the top end of the original guidance range Fleet Enhancement program advanced with repowerings for...
Clearway Energy, Inc. Reports Full Year 2025 Financial Results
Achieved 2025 financial results at the top end of the original guidance range Fleet Enhancement program advanced with repowerings for...
Clearway Signs Portfolio of Power Purchase Agreements with Google Totaling Nearly 1.2 GW Across Three States
Clearway Energy Group announced the 2025 execution of three new long-term power purchase agreements with Google totaling 1.17 GW of...
Clearway Signs Portfolio of Power Purchase Agreements with Google Totaling Nearly 1.2 GW Across Three States
Clearway Energy Group announced the 2025 execution of three new long-term power purchase agreements with Google totaling 1.17 GW of...
Last updated 2026-03-26