2.9 MW Solar operating in Bristol, MA — ISO New England Inc.
2.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
41.6616, -70.8758
County
Bristol, MA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Consolidated Edison Development Inc. | Consolidated Edison Development Inc. | — |
| Owner(s) | Consolidated Edison Development Inc. | — | — |
| Status | Operating | operating | — |
Fairhaven MA 2 is a 2.9 MW solar photovoltaic power plant located in Bristol County, Massachusetts. The plant began operating in 2021 and has one generator. Consolidated Edison Development Inc. is the owner and operator.
The plant's latest annual generation was 4,498 MWh, resulting in a capacity factor of 17.6%. Fairhaven MA 2 uses a fixed tilt solar tracking system. Within Massachusetts, the plant ranks 151st out of 435 power plants. Nationally, it ranks 4115th out of 7108. The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
13.2 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
216 MWh
Latest Month
4.5K MWh
Annual Generation
17.6%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Wing Lane Substation · 115 kV
Substation Distance
2.009 km
Operator
Eversource
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.WINGLANE13.2
Pricing Hub
.H.INTERNAL_HUB
Node Source
Curated node match