2.9 MW Solar operating in Middlesex, MA — ISO New England Inc.
2.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2016
Operating Since
Coordinates
42.5829, -71.2464
County
Middlesex, MA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Iron Horse Solar 1, LLC | Iron Horse Solar 1 | — |
| Owner(s) | Iron Horse Solar 1, LLC | — | — |
| Status | Operating | operating | — |
Iron Horse Solar I CSG is a 2.9 MW solar photovoltaic power plant located in Middlesex County, Massachusetts. The plant began operating in 2016 and has one generator. It is owned and operated by Iron Horse Solar 1, LLC. The plant's primary fuel source is the sun.
The plant operates within the ISO New England Inc. balancing authority and the NPCC NERC region. In the most recent year with available data, the plant generated 4,260 MWh of electricity, achieving a capacity factor of 16.7%. Iron Horse Solar I CSG is ranked 150th out of 435 solar plants in Massachusetts, and 4084th out of 7108 solar plants nationally. The solar panels at the facility utilize a fixed tilt tracking system.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
23 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
175 MWh
Latest Month
4.3K MWh
Annual Generation
16.7%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Billerica Substation · 115 kV
Substation Distance
2.489 km
Operator
National Grid
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.BILERCA 13.2T5 LD
Pricing Hub
.H.INTERNAL_HUB
Node Source
Curated node match