1.2 MW Batteries (1 MW) + Solar Photovoltaic (1 MW) operating in Westchester, NY — New York Independent System Operator
1.2 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2022
Operating Since
Coordinates
41.1000, -73.7715
County
Westchester, NY
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Consolidated Edison Solutions Inc. | — | — |
| Owner(s) | Consolidated Edison Solutions Inc. | — | — |
| Status | Operating | — | — |
The Mt Pleasant Community Center is a hybrid power plant located in Westchester County, New York. The facility, owned and operated by Consolidated Edison Solutions Inc., began operation in 2022. It has a total capacity of 1.2 MW derived from two generators utilizing both solar photovoltaic and battery storage technologies. The battery energy storage system (BESS) has a capacity of 3 MWh, providing 4.29 hours of duration and employing lithium-ion battery (LIB) chemistry. The solar array uses a fixed-tilt tracking system.
The plant's primary fuel is reported as 'MWH' in regulatory filings, reflecting its hybrid nature. In its most recent year of operation, the Mt Pleasant Community Center generated 718 MWh of electricity, achieving a capacity factor of 6.8%. The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. It is ranked as the 64th largest plant out of 65 in New York State, and 1183rd out of 1205 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
New York Independent System Operator
Grid Voltage
13.8 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
29 MWh
Net Discharge
718 MWh
Annual Net Energy
6.8%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
PLSNTVLE_13_KV_13KVDISA_REV_LBMP_I
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone I
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.