1.1 MW BESS operating in Kalamazoo, MI — Midcontinent Independent Transmission System Operator, Inc..
1.1 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2018
Operating Since
Coordinates
42.2600, -85.6497
County
Kalamazoo, MI
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Consumers Energy Co - (MI) | — | — |
| Owner(s) | Consumers Energy Co - (MI) | — | — |
| Status | Operating | — | — |
Parkview Battery is a 1.1 MW battery energy storage system located in Kalamazoo County, Michigan. The plant began operating in 2018 and is owned and operated by Consumers Energy Co. The facility consists of a single generator utilizing battery technology with lithium-ion (LIB) chemistry. The battery system has a total storage capacity of 1 MWh and a duration of 0.91 hours.
Parkview Battery's primary fuel is listed as "MWH," indicating that it draws power from the grid to charge its batteries. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) market and is under the balancing authority of the same entity. Within Michigan, Parkview Battery is ranked 6th out of 6 battery storage facilities. Nationally, it is ranked 1188 out of 1205 similar facilities.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
24.9 kV
Regulatory Status
RE
Entity Type
Investor-Owned Utility
Sector
Electric Utility
−6 MWh
Net Charging
-73 MWh
Annual Net Energy
-0.8%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Bronco Substation · 138 kV
Substation Distance
< 10 km
Operator
Consumers Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MICHIGAN.HUB
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.