2.4 MW Solar operating in Riverside, CA — California Independent System Operator
2.4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
33.8639, -117.2140
County
Riverside, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SkyHigh 2 Solar | SkyHigh 2 Solar | — |
| Owner(s) | SkyHigh 2 Solar | — | — |
| Status | Operating | operating | — |
The EMWD - Moreno Valley RWRF is a 2.4 MW solar photovoltaic power plant located in Riverside County, California. The plant began operating in 2021 and has one generator. It is owned and operated by SkyHigh 2 Solar. The plant utilizes dual-axis solar tracking technology to maximize energy capture.
The plant's primary fuel source is solar energy. In its most recent year of operation, the EMWD - Moreno Valley RWRF generated 5,534 MWh of electricity, achieving a capacity factor of 26.2%. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant ranks 474th in size among California's 862 power plants, and 4358th nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
237 MWh
Latest Month
5.5K MWh
Annual Generation
26.2%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
KARMA_1_N004
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match