2.4 MW Solar operating in Hampshire, MA — ISO New England Inc.
2.4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2017
Operating Since
Coordinates
42.2940, -72.7113
County
Hampshire, MA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Ameresco Glendale Road Solar PV LLC | Ameresco Glendale Road Solar PV | — |
| Owner(s) | Ameresco Glendale Road Solar PV LLC | — | — |
| Status | Operating | operating | — |
Northampton Landfill Solar PV is a 2.4 MW solar photovoltaic power plant located in Hampshire County, Massachusetts. The plant began operating in 2017 and has one generator. It is owned and operated by Ameresco Glendale Road Solar PV LLC. The plant utilizes a fixed-tilt solar tracking system.
In its most recent year of operation, Northampton Landfill Solar PV generated 3,772 MWh of electricity, achieving a capacity factor of 17.9%. The plant is connected to the ISO New England Inc. balancing authority and is within the Northeast Power Coordinating Council (NPCC) NERC region. Northampton Landfill Solar PV ranks as the 191st largest solar plant in Massachusetts out of 435, and 4356th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
NPCC
Balancing Authority
ISO New England Inc.
Grid Voltage
13.8 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
146 MWh
Latest Month
3.8K MWh
Annual Generation
17.9%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Florence Substation · 115 kV
Substation Distance
4.785 km
Operator
National Grid
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.FLORENCE13.8
Pricing Hub
.H.INTERNAL_HUB
Node Source
Curated node match