4.2 MW Solar operating in Riverside, CA — California Independent System Operator
4.2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
33.8025, -117.0231
County
Riverside, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SkyHigh 2 Solar | SkyHigh 2 Solar | — |
| Owner(s) | SkyHigh 2 Solar | — | — |
| Status | Operating | operating | — |
The EMWD - San Jacinto RES BCT is a 4.2 MW solar photovoltaic power plant located in Riverside County, California. The plant began operating in 2022 and has a single generator. SkyHigh 2 Solar is the plant's operator.
The plant's latest annual generation was 2,969 MWh, resulting in a capacity factor of 8.0%. The facility utilizes single-axis solar tracking technology. EMWD - San Jacinto RES BCT operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant ranks 330th out of 862 solar facilities in California and 3348th nationally out of 7108 facilities.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
132 MWh
Latest Month
3.0K MWh
Annual Generation
8.0%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_SP15_GEN-APND
Node Source
OSM spatial match