1.3 MW Solar operating in Riverside, CA — California Independent System Operator
1.3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
33.7981, -117.0171
County
Riverside, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SkyHigh 2 Solar | SkyHigh 2 Solar | — |
| Owner(s) | SkyHigh 2 Solar | — | — |
| Status | Operating | operating | — |
The EMWD - San Jacinto RWRF NEM is a 1.3 MW solar photovoltaic power plant located in Riverside County, California. The plant began operating in 2021 and is owned and operated by SkyHigh 2 Solar. It consists of a single generator utilizing single-axis tracking technology to maximize solar energy capture. The plant's primary fuel source is the sun.
In its most recent year of operation, the EMWD - San Jacinto RWRF NEM generated 10,194 MWh of electricity, achieving a capacity factor of 81.5%. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In terms of size, the plant is ranked 693 out of 862 solar facilities in California and 6073 out of 7108 nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
536 MWh
Latest Month
10.2K MWh
Annual Generation
81.5%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_SP15_GEN-APND
Node Source
OSM spatial match