1.6 MW Solar operating in San Luis Obispo, CA — California Independent System Operator
1.6 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2020
Operating Since
Coordinates
35.5960, -120.6896
County
San Luis Obispo, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SkyHigh 2 Solar | SkyHigh 2 Solar | — |
| Owner(s) | SkyHigh 2 Solar | — | — |
| Status | Operating | operating | — |
The Firestone Walker Brewery - Phase 1 solar photovoltaic plant is located in San Luis Obispo County, California. The plant, owned and operated by SkyHigh 2 Solar, has a total capacity of 1.6 MW and commenced operations in 2020. It consists of a single generator utilizing solar photovoltaic technology with single-axis tracking.
The plant's latest annual generation was 3,336 MWh, resulting in a capacity factor of 23.7%. It operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant is ranked 570th out of 862 solar facilities in California and 5616th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
177 MWh
Latest Month
3.3K MWh
Annual Generation
23.7%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Paso Robles · 12 kV
Substation Distance
2.545 km
Operator
Pacific Gas and Electric Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
PSARBLS_6_N007
Pricing Hub
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match