1 MW Solar operating in St Francis, AR — Midcontinent Independent Transmission System Operator, Inc..
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
34.9795, -90.8060
County
St Francis, AR
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenbacker Renewable Energy Corporation | Greenbacker Renewable Energy | — |
| Owner(s) | Greenbacker Renewable Energy Corporation | — | — |
| Status | Operating | operating | — |
The Forrest City- Prison Site is a 1 MW solar photovoltaic power plant located in St. Francis County, Arkansas. The plant began operating in 2021 and is owned and operated by Greenbacker Renewable Energy Corporation. It utilizes single-axis tracking technology to maximize solar energy capture. The plant is interconnected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and resides within the SERC Reliability Corporation NERC region.
In its most recent year of operation, the Forrest City- Prison Site generated 1,848 MWh of electricity, achieving a capacity factor of 21.0%. The plant consists of a single generator. In terms of size, the facility ranks 75th out of 77 power plants in Arkansas and 6741st out of 7108 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
13.8 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
81 MWh
Latest Month
1.8K MWh
Annual Generation
21.0%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ARKANSAS.HUB
Node Source
OSM spatial match