1 MW Solar operating in St Francis, AR — Midcontinent Independent Transmission System Operator, Inc..
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
35.0394, -90.8065
County
St Francis, AR
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Greenbacker Renewable Energy Corporation | Greenbacker Renewable Energy | — |
| Owner(s) | Greenbacker Renewable Energy Corporation | — | — |
| Status | Operating | operating | — |
The Forrest City-Eldridge Road solar power plant is located in St. Francis County, Arkansas. The plant has a total capacity of 1 MW and began operating in 2021. It is owned and operated by Greenbacker Renewable Energy Corporation. The facility utilizes a single-axis tracking system for its solar photovoltaic technology and consists of one generator.
The plant's latest annual generation was 1,956 MWh, resulting in a capacity factor of 22.2%. Forrest City-Eldridge Road operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC NERC region. In terms of size, the plant ranks 76th out of 77 power plants in Arkansas and 6762nd nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
13.2 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
85 MWh
Latest Month
2.0K MWh
Annual Generation
22.2%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ARKANSAS.HUB
Node Source
OSM spatial match