8.4 MW Wind operating in Jackson, MN — Midcontinent Independent Transmission System Operator, Inc..
8.4 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2008
Operating Since
Coordinates
43.6259, -95.3648
County
Jackson, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | ALLETE Clean Energy | — | — |
| Owner(s) | ALLETE Clean Energy | — | — |
| Status | Operating | — | — |
The Cisco wind power plant is located in Jackson County, Minnesota. It has a total capacity of 8.4 MW and began operating in 2008. The plant is owned and operated by ALLETE Clean Energy. It consists of a single generator utilizing onshore wind turbine technology.
Cisco operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority. In the most recent year of data, the plant generated 9,087 MWh of electricity, achieving a capacity factor of 12.3%. Cisco is ranked as the 56th largest power plant in Minnesota out of 123, and nationally it is ranked 1183 out of 1424.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
69 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
755 MWh
Latest Month
9.1K MWh
Annual Generation
12.3%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
GRE.CHRISFRWD
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source