2 MW Wind operating in Jackson, MN — Midcontinent Independent Transmission System Operator, Inc..
2 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2003
Operating Since
Coordinates
43.6514, -95.3686
County
Jackson, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Brewster | — | — |
| Owner(s) | Brewster | — | — |
| Status | Operating | — | — |
DL Windy Acres LLC is a 2 MW wind power plant located in Jackson County, Minnesota. The plant began operating in 2003 and is owned and operated by Brewster. It consists of a single onshore wind turbine generator. The plant connects to the grid within the Midcontinent Independent Transmission System Operator (MISO) balancing authority, in the Midwest Reliability Organization (MRO) NERC region.
In the most recent year with available data, DL Windy Acres generated 4,061 MWh of electricity, achieving a capacity factor of 23.2%. The plant ranks 80th in size among 123 power plants in Minnesota, and 1303rd out of 1424 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
69 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
381 MWh
Latest Month
4.1K MWh
Annual Generation
23.2%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
GRE.CHRISFRWD
Pricing Hub
MINN.HUB
Location Type
Generation Node
Node Source
Curated node match