1 MW Solar operating in Stearns, MN — Midcontinent Independent Transmission System Operator, Inc..
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
45.6523, -94.7542
County
Stearns, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | New Munich Solar LLC | New Munich Solar | — |
| Owner(s) | New Munich Solar LLC | — | — |
| Status | Operating | operating | — |
New Munich Solar is a 1 MW solar photovoltaic power plant located in Stearns County, Minnesota. The plant began operating in 2019 and is owned and operated by New Munich Solar LLC. It consists of a single generator utilizing single-axis tracking technology to maximize solar energy capture. The plant's primary fuel source is the sun (SUN).
In its most recent year of operation, New Munich Solar generated 2,048 MWh of electricity, achieving a capacity factor of 23.3%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority, which is part of the Midwest Reliability Organization (MRO) NERC region. Based on its total capacity, New Munich Solar ranks as the 426th largest power plant in Minnesota out of 540 plants, and 6865th nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
0.48 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
46 MWh
Latest Month
2.0K MWh
Annual Generation
23.3%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Riverview Substation · 345 kV
Substation Distance
2.735 km
Operator
Great River Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
NSP.MRES_5.AZ
Pricing Hub
MINN.HUB
Location Type
Trading Hub
Node Source
Curated node match