1 MW Solar operating in Fresno, CA — California Independent System Operator
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
36.4864, -120.0451
County
Fresno, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Maas Energy Works | Maas Energy Works | — |
| Owner(s) | Maas Energy Works | — | — |
| Status | Operating | operating | — |
The Van der Kooi Dairy Solar Array is a 1 MW solar photovoltaic power plant located in Fresno County, California. The plant began operating in 2021 and is owned and operated by Maas Energy Works. It consists of a single generator utilizing fixed-tilt solar tracking technology. The plant is interconnected to the California Independent System Operator (CAISO) balancing authority within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, the Van der Kooi Dairy Solar Array generated 3,651 MWh of electricity, achieving a capacity factor of 41.6%. The plant is ranked 775th out of 862 solar facilities in California and 6346th out of 7108 solar facilities nationally, based on capacity.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
0.49 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
Industrial Non-CHP
191 MWh
Latest Month
3.7K MWh
Annual Generation
41.6%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Calflax
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
—
Pricing Hub
TH_ZP26_GEN-APND
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.