1.9 MW Solar operating in Richland, OH — PJM Interconnection, LLC
1.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
40.8963, -82.6731
County
Richland, OH
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AEP Onsite Partners, LLC | AEP OnSite Partners | — |
| Owner(s) | AEP Onsite Partners, LLC | — | — |
| Status | Operating | operating | — |
Shelby Solar Array is a 1.9 MW solar photovoltaic power plant located in Richland County, Ohio. The plant began operating in 2019 and is owned and operated by AEP Onsite Partners, LLC. It consists of a single generator utilizing single-axis tracking to maximize solar energy capture. The plant's primary fuel source is solar energy (SUN).
In its most recent year of operation, Shelby Solar Array generated 3,214 MWh of electricity, achieving a capacity factor of 19.3%. The plant operates within the PJM Interconnection, LLC balancing authority, which is part of the ReliabilityFirst Corporation (RFC) NERC region. In terms of size, Shelby Solar Array ranks as the 71st largest solar plant in Ohio out of 84, and 5412th nationally out of 7108.
Generated from EIA, GEM, and public data sources
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
12.47 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
64 MWh
Latest Month
3.2K MWh
Annual Generation
19.3%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
AEP-DAYTON HUB
Node Source
Shared substation inference