9.9 MW Solar operating in Bosque, TX — Electric Reliability Council of Texas, Inc.
9.9 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2017
Operating Since
Coordinates
32.0676, -97.5332
County
Bosque, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cardinal Renewables | Alchemy Renewable Energy | — |
| Owner(s) | Cardinal Renewables | — | — |
| Status | Operating | operating | — |
TPE Whitney Solar, LLC is a 9.9 MW solar photovoltaic power plant located in Bosque County, Texas. The plant began operating in 2017 and has one generator. Cardinal Renewables is the plant's operator. The facility utilizes single-axis tracking to maximize solar energy capture. TPE Whitney Solar is connected to the Electric Reliability Council of Texas (ERCOT) grid, operating within the TRE NERC region.
In its most recent year of operation, the plant generated 16,349 MWh of electricity, achieving a capacity factor of 18.8%. According to available data, TPE Whitney Solar ranks as the 253rd largest solar plant in Texas out of 298, and 1925th nationally out of 7108. Financial data is available for this plant via LBNL, though specific figures are not provided.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
24.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
716 MWh
Latest Month
16.3K MWh
Annual Generation
18.8%
Capacity Factor
$22.3/MWh
Energy Value
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match