245 MW Solar planned in Bosque, TX — Electric Reliability Council of Texas, Inc.
245 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Coordinates
31.8986, -97.4665
County
Bosque, TX
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cypress Creek Renewables | Cypress Creek Renewables | — |
| Owner(s) | Cypress Creek Renewables | Cypress Creek Renewables | — |
| Status | Planned | pre-construction | — |
GEM identifies the owner as Cypress Creek Renewables
This entity is not yet in the GEM ownership database — chain unavailable.
The Langer solar power plant is located in Bosque County, Texas. The plant has a total capacity of 245 MW and consists of a single generator utilizing solar photovoltaic technology. The primary fuel source is solar energy. The plant is owned and operated by Cypress Creek Renewables.
Langer operates within the Electric Reliability Council of Texas (ERCOT) balancing authority. The plant's solar panels use a fixed-tilt tracking system. Langer ranks as the 71st largest power plant in Texas out of 192, and 157th nationally out of 639 plants.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Powell Substation · 69 kV
Substation Distance
< 10 km
Operator
Brazos Electric
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
Paladin Energy halts uranium mining in Namibia due to heavy rainfall
Australian uranium producer Paladin Energy said on Friday it had temporarily halted operations at its Langer Heinrich mine in Namibia due to heavy rainfall in...
Top 10: Nuclear Power Companies
Including Uranium Energy, Cameco and BWX Technologies, Energy Digital runs through the world's 10 largest nuclear power companies ranked by...
Trudy Sears Langer Obituary (2023) - Alvin, TX - Scott Funeral Home - Alvin
Trudy Langer Obituary Trudy Sears Langer, age 82, passed away on September 30th, 2023 surrounded by family, friends and immense love after a...
Viktor Bryukhanov, engineer blamed in Chernobyl explosion, dies at 85
He oversaw the construction and operation of the nuclear power plant in Ukraine that in 1986 became the site of one of the worst accidents...
Last updated 2026-03-14
View all 10 articles