1 MW Solar operating in Scott, MN — Midcontinent Independent Transmission System Operator, Inc..
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2020
Operating Since
Coordinates
44.5929, -93.8466
County
Scott, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SunShare Management | SunShare Management | — |
| Owner(s) | SunShare Management | — | — |
| Status | Operating | operating | — |
Linden 01 CSG is a 1 MW solar photovoltaic power plant located in Scott County, Minnesota. The plant began operating in 2020 and is owned and operated by SunShare Management. It utilizes a single generator and fixed-tilt solar tracking technology. The plant's primary fuel source is solar energy (SUN).
In its most recent year of operation, Linden 01 CSG generated 1,829 MWh of electricity, achieving a capacity factor of 20.8%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority. Based on capacity, Linden 01 CSG ranks as the 247th largest power plant in Minnesota out of 540, and 6318th nationally out of 7108. The plant's NERC region is MRO.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
13.8 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
58 MWh
Latest Month
1.8K MWh
Annual Generation
20.8%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match