1 MW Solar operating in Carver, MN — Midcontinent Independent Transmission System Operator, Inc..
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2020
Operating Since
Coordinates
44.6818, -93.7626
County
Carver, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Standard Solar | Standard Solar | — |
| Owner(s) | Standard Solar, US Solar | US Solar [10%]; Standard Solar [90%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as US Solar [10%]; Standard Solar [90%]
This entity is not yet in the GEM ownership database — chain unavailable.
USS Westeros Solar LLC CSG is a 1 MW solar photovoltaic power plant located in Carver County, Minnesota. The plant began operating in 2020 and has a single generator. It is owned and operated by Standard Solar. The plant utilizes single-axis tracking to maximize solar energy capture.
The plant's primary fuel source is the sun. In its most recent year of operation, USS Westeros Solar LLC CSG generated 1,753 MWh of electricity, achieving a capacity factor of 20.0%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority. In terms of size, the plant is ranked 289th out of 540 power plants in Minnesota, and 6,583rd out of 7,108 plants nationally. The plant is located within the MRO NERC region.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
16 MWh
Latest Month
1.8K MWh
Annual Generation
20.0%
Capacity Factor
No financial data available for this plant.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match