1 MW Solar operating in Sherburne, MN — Midcontinent Independent Transmission System Operator, Inc..
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2019
Operating Since
Coordinates
45.4652, -94.0910
County
Sherburne, MN
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | E. Goenner Community Solar LLC | E. Goenner Community Solar | — |
| Owner(s) | E. Goenner Community Solar LLC | — | — |
| Status | Operating | operating | — |
The E. Goenner Project CSG is a 1 MW solar photovoltaic power plant located in Sherburne County, Minnesota. The plant began operating in 2019 and has a single generator. It is owned and operated by E. Goenner Community Solar LLC. The plant utilizes single-axis tracking technology to maximize solar energy capture.
The E. Goenner Project CSG operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the Midwest Reliability Organization (MRO) NERC region. In its most recent year of operation, the plant generated 1,352 MWh of electricity, achieving a capacity factor of 15.4%. The plant ranks 253rd in size among Minnesota power plants and 6,349th nationally.
Generated from EIA, GEM, and public data sources
NERC Region
MRO
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
34.5 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
24 MWh
Latest Month
1.4K MWh
Annual Generation
15.4%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
I-94 Substation · 115 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.