1.2 MW Solar operating in Fresno, CA — California Independent System Operator
1.2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2018
Operating Since
Coordinates
36.8851, -119.7320
County
Fresno, CA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Forefront Power, LLC | Forefront Power | — |
| Owner(s) | Forefront Power, LLC | — | — |
| Status | Operating | operating | — |
The SCCCD - Clovis Community College solar photovoltaic plant is located in Fresno County, California. The plant has a total capacity of 1.2 MW and commenced operation in 2018. It is owned and operated by Forefront Power, LLC. The plant utilizes one solar photovoltaic generator and its primary fuel source is solar energy. The solar panels are mounted with a fixed tilt.
In its latest year of reported generation, the plant produced 2,017 MWh of electricity, resulting in a capacity factor of 19.1%. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Based on capacity, the plant ranks 705th out of 862 solar plants in California and 6157th out of 7108 plants nationally.
Generated from EIA, GEM, and public data sources
NERC Region
WECC
Balancing Authority
California Independent System Operator
Grid Voltage
21 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
72 MWh
Latest Month
2.0K MWh
Annual Generation
19.1%
Capacity Factor
No financial data available for this plant.
Point of Interconnection
Nearest Substation
Woodward Substation · 115 kV
Substation Distance
2.03 km
Operator
Pacific Gas and Electric
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
WOODWARD_1_N005
Pricing Hub
TH_ZP26_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match