255 MW Solar operating in Pecos, TX — Electric Reliability Council of Texas, Inc.
255 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
31.0355, -102.4646
County
Pecos, TX
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Concho Bluff LLC | Copenhagen Infrastructure Partners | — |
| Owner(s) | Concho Bluff LLC | Copenhagen Infrastructure Partners Holding | — |
| Status | Operating | operating | — |
Greasewood Solar is a 255 MW solar photovoltaic power plant located in Pecos County, Texas. The plant began operating in 2021 and has one generator. It is owned by Copenhagen Infrastructure Partners Holding, a company based in Denmark, and operated by Concho Bluff LLC. Greasewood Solar ranks as the 50th largest solar plant in Texas out of 192, and 106th nationally out of 639.
The plant's primary fuel source is the sun, and it utilizes single-axis tracking to maximize solar energy capture. In its most recent year of operation, Greasewood Solar generated 408,300 MWh of electricity, achieving a capacity factor of 18.2%. The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. Financial data is available for Greasewood Solar, sourced from LBNL Solar.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
345 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Greasewood Solar
30.7K MWh
Latest Month
408.3K MWh
Annual Generation
18.2%
Capacity Factor
$19.2/MWh
Energy Value
Market Position
ISO/RTO Market
ERCOT
LMP Node
GREASWOD_ALL
Pricing Hub
HB_WEST
Secondary Zone
LZ_WEST
Location Type
Resource Node
Node Source
Curated node match
Fire Weather Watch: Sacramento Foothills and Guadalupe Mountains; Chaves County Plains; Eddy Plains; Lea; Gaines; Dawson
Fire Weather Watch issued March 21 at 2:43AM CDT until March 23 at 12:00AM CDT by NWS Midland/Odessa TX
Fire Weather Watch: Sacramento Foothills and Guadalupe Mountains; Chaves County Plains; Eddy Plains; Lea; Gaines; Dawson
Fire Weather Watch issued March 21 at 2:43AM CDT until March 23 at 12:00AM CDT by NWS Midland/Odessa TX
Intersect’s Radian Solar among largest Texas projects at 415 MW
The utility solar project in central Texas uses First Solar U.S.-made panels and is one of the top 10 largest solar projects in the country,...
Intersect’s Radian Solar among largest Texas projects at 415 MW
The utility solar project in central Texas uses First Solar U.S.-made panels and is one of the top 10 largest solar projects in the country,...
Last updated 2026-03-21
View all 10 articles