255 MW Solar operating in Pecos, TX — Electric Reliability Council of Texas, Inc.
255 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Coordinates
31.1701, -103.1038
County
Pecos, TX
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Taygete Energy Project LLC | 7X Energy | — |
| Owner(s) | TE Taygete Energy HoldCo, LLC | 7X Energy [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as 7X Energy [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Taygete Energy Project LLC is a 255 MW solar photovoltaic power plant located in Pecos County, Texas. The plant, which began operating in 2021, is owned and operated by Taygete Energy Project LLC. It utilizes single-axis tracking technology to maximize solar energy capture. As of its latest annual generation data, the plant produced 547,505 MWh, achieving a capacity factor of 24.5%.
The Taygete Energy Project operates within the Electric Reliability Council of Texas (ERCOT) balancing authority and the TRE NERC region. It is ranked as the 51st largest solar plant in Texas out of 192, and nationally it holds the rank of 105 out of 639. Financial data is available for the plant, sourced from LBNL Solar.
Generated from EIA, GEM, and public data sources
NERC Region
TRE
Balancing Authority
Electric Reliability Council of Texas, Inc.
Grid Voltage
138 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Taygete Solar
32.5K MWh
Latest Month
547.5K MWh
Annual Generation
24.5%
Capacity Factor
$34.5/MWh
LCOE (Levelized Cost)
$24.1/MWh
Energy Value
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_WEST
Secondary Zone
LZ_WEST
Node Source
Shared substation inference
Fire Weather Watch: Sacramento Foothills and Guadalupe Mountains; Chaves County Plains; Eddy Plains; Lea; Gaines; Dawson
Fire Weather Watch issued March 21 at 2:43AM CDT until March 23 at 12:00AM CDT by NWS Midland/Odessa TX
Fire Weather Watch: Sacramento Foothills and Guadalupe Mountains; Chaves County Plains; Eddy Plains; Lea; Gaines; Dawson
Fire Weather Watch issued March 21 at 2:43AM CDT until March 23 at 12:00AM CDT by NWS Midland/Odessa TX
Renewable Energy
Our team advises clients on all legal aspects of renewable energy transactions—from greenfield project development and finance to the purchase and sale of large...
Intersect’s Radian Solar among largest Texas projects at 415 MW
The utility solar project in central Texas uses First Solar U.S.-made panels and is one of the top 10 largest solar projects in the country,...
Last updated 2026-03-21
View all 10 articles