175 MW Solar operating in Charles City, VA — PJM Interconnection, LLC
175 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
37.3888, -77.1804
County
Charles City, VA
Nearby Plants
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Distributed Energy | AES | — |
| Owner(s) | AES Distributed Energy | AES | — |
| Status | Operating | operating | — |
Skipjack Solar Center is a 175 MW solar photovoltaic power plant located in Charles City County, Virginia. The plant, which began operating in 2022, is owned by AES and operated by AES Distributed Energy. It utilizes single-axis tracking technology to maximize solar energy capture. Skipjack Solar Center is connected to the PJM Interconnection, LLC balancing authority and resides within the SERC NERC region. The facility is the 6th largest solar plant in Virginia out of 25, and ranks 303rd nationally out of 639 solar plants.
In its most recent year of operation, Skipjack Solar Center generated 298,427 MWh of electricity, achieving a capacity factor of 19.4%. Financial data is available for the plant from LBNL, though specific figures are not provided. The plant has been the subject of two news articles, one focusing on industry trends and the other on business deals. The plant has one generator.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
PJM Interconnection, LLC
Grid Voltage
230 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
12.0K MWh
Latest Month
298.4K MWh
Annual Generation
19.4%
Capacity Factor
$41.0/MWh
LCOE (Levelized Cost)
$34.5/MWh
Energy Value
Point of Interconnection
Nearest Substation
Chickahominy Substation · 500 kV
Substation Distance
0.035 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
CHICKHOM34.5 KV CHICK1SP
Pricing Hub
DOMINION HUB
Location Type
Generation Node
Node Source
Curated node match
Constellation Signs 175 MW Solar Agreement to Supply an Aggregation of Three Commercial Customers
Constellation has announced an agreement with three major commercial customers to power their operations with renewable energy.
Constellation Signs 175 MW Solar Agreement to Supply an Aggregation of Three Commercial Customers
Constellation has announced an agreement with three major commercial customers to power their operations with renewable energy.
Solar facility now supplying renewable energy for two-thirds of university's electricity use
With the development of the Skipjack Solar Center, JHU achieves goal of reducing greenhouse gas emissions by 51% three years early.
Last updated 2026-03-26