175 MW Solar operating in Scott, MS — Midcontinent Independent Transmission System Operator, Inc..
175 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
32.5510, -89.7301
County
Scott, MS
Nearby Plants
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Pearl River Solar Park, LLC | EDP Renewables | — |
| Owner(s) | Pearl River Solar Park, LLC | EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship [100%] | — |
| Status | Operating | operating | — |
GEM identifies the owner as EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship [100%]
This entity is not yet in the GEM ownership database — chain unavailable.
Pearl River Solar Park LLC is a 175 MW solar photovoltaic power plant located in Scott County, Mississippi. The plant, which began operating in 2024, is owned and operated by Pearl River Solar Park, LLC. It utilizes single-axis tracking technology to maximize solar energy capture. As of the latest data, it ranks as the third-largest solar plant in Mississippi out of 13, and 297th nationally out of 639 solar plants.
The plant's latest annual generation was 418,916 MWh, resulting in a capacity factor of 27.3%. Pearl River Solar Park operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and is situated in the SERC Reliability Corporation NERC region. Financial data for the plant is available from LBNL, indicating that further details on costs and power purchase agreements may be accessible.
Generated from EIA, GEM, and public data sources
NERC Region
SERC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc..
Grid Voltage
115 kV
Regulatory Status
NR
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
20.7K MWh
Latest Month
418.9K MWh
Annual Generation
27.3%
Capacity Factor
$42.5/MWh
LCOE (Levelized Cost)
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MS.HUB
Node Source
OSM spatial match
$235M Solar facility in Scott County approved
SCOTT CO., Miss. (WLBT) - A 1,760-acre solar facility in Scott County was approved. Central District Public Service Commissioner Brent...
Last updated 2026-03-26
View all articles